With the 2019 Dakar Rally now under way, this is the perfect time to highlight a fantastic project to which Stalufor concepten in bouwbeslag BV made a valuable contribution. Team Tilbox (Dakar 2016/2017, led by director Frank Tilburgs) is part of Tilbox in Valkenswaard (formerly Tilburgs Truck Parts). When designing a new business premises, TIlbox wanted to find a way to display the Dakar truck indoors in a prominent position. Anyone who has seen a Dakar truck up close knows how much space a façade needs to provide for it to pass through. The sliding door leaves were exceptionally large, wide and heavy, and the client also wanted a fully automatic door solution. This led our client Alument BV to bring us in to tackle this complex challenge.

Stalufor’s technical sales advisers quickly realised that this automatic door solution could not be achieved using a single sliding door operator. Given the width of the opening and the weight of the leaves, they recommended two separate dormakaba ES 200 sliding door operators. Operator 1 controls the actions of operator 2. The first receives signals from the user (master) and passes them on to the second operator (slave) via a data connection.

Our client Alument, a specialist in façade construction, installed running gear beneath the leaves, each of which weighs more than 300 kg, to guide the operators. Alument handles production in-house, enabling it to realise even the most complex constructions. Quality and service are also top priorities at Alument.

The newly built Tilbox premises are, to put it mildly, high-tech. In addition to a large automatic main entrance, the entire building has climate control, and the access control system is linked to several KFV Genius motorised locks. As well as advising on the solutions described above, the technical specialists at Stalufix technische ondersteuning BV installed and commissioned the complex system. When, after a few months, it became clear that the door leaves were subject to unexpectedly high wind loads, Stalufix also visited the site to assess the situation and recommended electromechanical holding magnets with very high holding force, which were subsequently installed. The holding magnets are connected to the emergency power supply and linked to the operators, so the client does not need to take any additional action to operate them. To complete the façade’s clean design, the holding magnets were painted to match before installation. The end result speaks for itself!

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectGeneral
Share this article

Advertisement

Follow on Profiel

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.